Case Study - Demolition

Case Study - Demolition

INTRODUCTION

Industry: Demolition
Location: Oxford
Start Date: August 2023
Duration: 17 weeks
System: AI Solar CCTV Towers

65,637KG

emissions saved

PROJECT OVERVIEW
The 17 week long project delivered demolition of the building, including the grubbing up and removal of the existing foundations along with the demolition of the reinforced concrete frame superstructure. During this process the client had to cap the gas supply and communications from the building.
CHALLENGE
The client needed to reduce their weekly rental rates while still protecting the site and assets.
SOLUTION
Our team installed 2 AI Solar CCTV Towers, powered purely by clean, solar energy with no diesel back up generations or emissions. This also allowed our client to save 65,637KG on their carbon output.